Completed Projects
-
2017 Overlay Projects
This annual project is part of the Countywide pavement preservation program. Overlays are performed on a regular basis to preserve the initial paving investment and provide additional safety enhancements.
Link to page -
CH 8 Reconstruction
The project was awarded to Chard Tiling & Excavating, Inc. Chard plans to begin the project on Tuesday September 8, 2015.
Link to page -
CH 16 Reconstruction
Expand existing two-lane rural section to a four-lane urban roadway consistent with the County Highway 16 Corridor Study between Dean Lakes Trail and CH 21. A pavement reclamation/resurfacing of the existing four-lane segment between CH 83 and Dean Lakes Trail will also occur as part of the project.
Link to page -
CH 17 Reconstruction
The purpose of this project is to increase safety and capacity of this segment of highway through lane expansion, intersection modifications, and access closures.
Link to page -
CH 27 at South Park Drive & 150th Street
The goal of this project is to improve and reduce congestion and improve traffic operations.
Link to page -
Highway 101/61 Southwest Reconnection Project
Scott County Highway 101 between existing Minnesota River bridge in Shakopee and Carver County Hwy 61/Flying Cloud Drive in Chanhassen
Link to page -
2016 HSIP Shoulder Widening
The 2016 Highway Safety Improvement Program (HSIP) Shoulder Widening project is designed to improve highway safety and increase performance on numerous roadways throughout Scott County.
Link to page -
CH 2 Culvert Replacements
This project is planned to be completed by the evening of September 7th, weather permitting.
Link to page -
CH 27 & CH 68 Roundabout
On October 20th, the Scott County Board approved a contract with a civil engineering consulting firm for the design of a roundabout at the intersection of CH 27 and CH 68.
Link to page -
CH 79 Trail Project
A trail is anticipated to be constructed on the East side of County Highway (CH) 79 from CH 78 to CH 16.
Link to page -
CH 60 Flood Recovery
View details regarding the flood recovery of County Highway in Scott County.
Link to page -
CR81 Culvert Replacements
This project is planned to be completed by the evening of September 12th.
Link to page -
MN 19 Turn Lanes in New Prague
Resurface State Highway 19 from the intersection of Alton Avenue in New Prague east to the intersections with Le Sueur County Road 3 (141st Ave) and Scott County Road 89 (Redwing Ave)
Link to page -
Highway 169 Crossover Project
This project will improve the safety and mobility in this area by construction an interchange and removing direct access to US Highway 169.
Link to page -
TH 169 / Mobile Manor Frontage Rd
Construct frontage road extending west and southwest from CH 69 along the south and east side of Highway 169 connecting to Mobile Manor.
Link to page -
CH 16 Pedestrian Crossings
Provide for pedestrian crossings on CH 16 at school crossing locations for Jackson, Shakopee High School, SACs, Sun Path, Eagle Creek. Project includes pedestrian activated crosswalk amenities, vehicle alert systems, raised center median and paving.
Link to page -
CH 83 Turn Lanes at 4th Avenue
The purpose of this project is to mitigate development impacts and address future traffic needs.
Link to page -
CH 46 & CH 86 Roundabout
This project will reconstruct the intersection as a roundabout in New Market Township.
Link to page -
CH 51 & CH 53 Culvert Replacement
Replace culvert to address continuing erosion stabilization problems along the right-of-way.
Link to page -
CH 83 at TH 169
CH 83 at TH 169 Changeable Message Signs
Link to page -
CH 83 Reconstruction
This project has achieved its design life for pavement structure and is need of major repairs. Capacity improvements are also needed due to the increase in traffic.
Link to page -
US Highway 169 Mobility Study
The purpose of the study is to identify and evaluate cost-effective options for improving transit and reducing congestion on Hwy 169 between Hwy 41 in Shakopee and Hwy 55 in Golden Valley. The study will focus on: 1. Highway Bus Rapid Transit (BRT) 2. MnPASS Express Lanes 3. Lower cost/high benefit improvements along the highway such as adding auxiliary lanes, turn lanes, modifying interchanges, and creating ways for buses to get through traffic more efficiently 4. Evaluating the potential for expanding bus service on Hwy 169 between Mankato and the Twin Cities Metro area
Link to page -
2018 Overlays on CH 2, CH 16, CH 21, CH 81
This annual project is part of the Countywide pavement preservation program. Overlays are performed on a regular basis to preserve the initial paving investment and provide additional safety enhancements.
Link to page -
CH 42 and TH 13 Intersection Improvements
Traffic studies conducted with developments in the northeast and southeast quadrants of CH 42 and TH 13 identified unacceptable levels of service so plans were made for action to be taken.
Link to page -
CH 8 Bridge Replacement
The purpose of this project is to replace Bridge Number 7063 on the south side of Cynthia Lake in Cedar Lake Township.
Link to page -
2019 Sealcoats
Link to page -
2019 Overlays CH 59 CH 53 CH 5 CH 16 CH 2 CH 89
This annual project is part of the Countywide pavement preservation program. Overlays are performed on a regular basis to preserve the initial paving investment and provide additional safety enhancements.
Link to page -
Bypass/Turnlane Project on CH 8 and CH 27
The 2016 Highway Safety Improvement Program (HSIP) Shoulder Widening project is designed to improve highway safety and increase performance on numerous roadways throughout Scott County.
Link to page -
CR 37 Turnback
Link to page -
CH 15 Bridge Replacement
This is an ongoing program to modernize bridges throughout the County.
Link to page -
2020 Striping Project
This is an ongoing program to modernize bridges throughout the County.
Link to page -
2020 Overlays
This annual project is part of the Countywide pavement preservation program. Overlays are performed on a regular basis to preserve the initial paving investment and provide additional safety enhancements.
Link to page -
CH 21/TH 13 Reconstruction
The project will improve access to downtown Prior Lake and will reduce congestion.
Link to page -
CH 42 from CH 17 to CH 83 Reconstruction
The project will reconstruct CH 42 between CH 17 and CH 83, and will update the 1.3 mile segment from a rural 2-lane to a 4-lane divided highway.
Link to page -
CH 2 & CH 91 Roundabout
This project will reconstruct the intersection as a roundabout in the City of Elko New Market.
Link to page -
Traffic Signal System CH 21/CH 91
A traffic signal will be constructed at the intersection of CH 21 (Eagle Creek Ave/185th St E) and CH 91/Natchez Ave.
Link to page -
Highways 169/41/78 Interchange
This project will improve the safety and mobility in this area by construction an interchange and removing direct access to US Highway 169.
Link to page -
Fiber Interconnect for ATMS
The purpose of this project is to allow County staff to manage and operate County signal assets remotely.
Link to page