2021 Overlays

  • Construction Year: 2021
  • Community: Throughout Scott County
  • Project Lead: Scott County
  • Contractor: McNamara Contracting, Inc.
  • Anticipated Start Date: May 15, 2021
  • Anticipated Completion Date: 

Overlay Project

CH 15: From CH 14 to TH 282

  • Start Date: 2021
  • Traffic Control Changes: Road open to local traffic only during construction.
  • Work Description: Work includes removal of existing bituminous, aggregate base cement stabilization, paving 5 inches of new bituminous, sign replacement, and sealcoating.
  • Completion

CH 15: From CH 10 to CH 8

  • Start Date: 2021
  • Traffic Control Changes: Road open to local traffic only during construction.
  • Work Description:  Work includes milling the existing bituminous, aggregate base cement stabilization, paving 5 inches of new bituminous, sign replacement and sealcoating.
  • Completion

CH 21: From CH 27 to East County Line in Credit River

  • Start Date: 2021
  • Traffic Control Changes:  Road open to local traffic only during construction.
  • Work Description: Work includes removing and replacing the top 3 inches of bituminous, center line joint rehabilitation, sealcoating, ADA retrofits, and sign replacement.
  • Completion

CH 29: From CH 91 to East County Line in Credit River

  • Start Date: 2021
  • Traffic Control Changes: Road open to local traffic only during construction. 
  • Work Description: Work includes removal of 6 inches of existing bituminous, cement stabilization of the aggregate base, paving 5 inches of new bituminous, sealcoating, and sign replacement. 
  • Completion

2021 Miscellaneous Bituminous Patching

  • Start Date: 2021
  • Traffic Control Changes: Road open to local traffic only during construction.
  • Work Description: Includes patching at various locations in the County, including Highway 69. Work is comprised of bituminous milling and paving.
  • Completion

Purpose & Justification

This annual project is part of the Countywide pavement preservation program. Overlays are performed on a regular basis to preserve the initial paving investment and provide additional safety enhancements.  Please drive with caution.

  1. Tulsa Crum

    Construction Supervisor
    Phone: 952-496-8041

  2. Highway Department


    Physical Address
    600 Country Trail East
    Jordan, MN 55352

    Phone: 952-496-8346


Website Map

Related Documents